electric mountain bike
bicycle

Dedicated transit, bike lanes likely for Hennepin Avenue reconstruction – Southwest Journal

Dedicated transit, bike lanes likely for Hennepin Avenue reconstruction – Southwest Journal 2020-10-03Leave a comment

electrical bike Devoted transit, bike lanes possible for Hennepin Avenue reconstruction – Southwest Journal

The venture’s predominant targets are to enhance sidewalks and intersections and substitute getting older site visitors indicators, Hughes mentioned. Town’s full avenue coverage, which first prioritizes pedestrians, then bikers and transit customers and lastly non-public automobiles, will probably be used to form the design, she mentioned, as will the town’s local weather motion plan and the proposed transportation motion plan.

Bettering security for customers is a precedence, with Hennepin Avenue recognized as a high-injury avenue by the town’s crash research. There have been 290 crashes on Hennepin in the venture space from 2016-19, with 69% of these crashes occurring at signalized intersections, in response to a examine. Pedestrians have been concerned in 11% of these crashes however accounted for almost all of whole crashes leading to severe harm.

Hennepin Avenue in Uptown is a busy avenue, used day by day by between 770-3,400 pedestrians, 220-280 cyclists, 6,600 transit riders on 400 buses and 15,000-31,500 automobiles, in response to a metropolis examine. Throughout weekday morning and night rush hours, buses carry 47% of individuals on Hennepin, however quantity for simply 3% of the automobiles. About 50% of journeys on the road are by way of journeys, in response to an origin-destination examine utilizing cellular phone knowledge.

Different deliberate tasks will affect the design. Metro Transit is growing the E Line, a deliberate bus speedy transit (BRT) service that will largely substitute the present Route 6 and require bigger stops than exist on Hennepin in the present day. Town is planning to reconstruct a three-block stretch of Franklin Avenue between Hennepin and Lyndale avenues in 2022 and can resurface Franklin west of Hennepin in 2021. Resurfacing can also be scheduled for twenty sixth and twenty eighth streets in 2021. Hennepin Avenue was reconstructed south of Lake Road in 2018.

Hennepin Avenue is a part of the Minneapolis Bicycle Grasp Plan, and any reconstruction is anticipated to include protected bike lanes, possible within the separated-path-on-the-sidewalk configuration featured within the ongoing Hennepin Avenue reconstruction Downtown. Public Works is inspecting choices that will run the bike lanes alongside Hennepin the size of the venture or divert cyclists going to and from Downtown to the Bryant Avenue bike boulevard at both twenty fourth Road or twenty sixth Road.

2023 could possibly be a busy season for avenue development in Southwest Minneapolis. Close by Bryant Avenue is scheduled to be reconstructed south of Lake Road starting in 2022 and increasing into 2023.

The venture is anticipated to price $18.5 million and is eligible for about $7 million in federal funding.

Town is accepting public touch upon the idea designs by way of Oct. 16.

Leave a Reply

Your email address will not be published. Required fields are marked *